Apollo High School Addition and Renovation

In Progress

This three-phased project included the design of the new Apollo Eagle Stadium (Phase 1) and a new student parking lot (Phase 2), both of which opened in Fall 2019. Phase 3 is a two-story, 26-classroom addition with a new secure front entrance and renovations to the existing facility.

The addition will include expanding the cafeteria to accommodate for increased student enrollments, new classrooms, science rooms and science lecture labs. Renovations include the kitchen, upgraded lighting throughout, as well as roofing and flooring repairs.

Construction on Phase 3 begins in Summer 2020.

 